Construction of a Data Center in the Greater Paris area

Mission details

Context

ARGOS Construction accompagne une société d’ingénierie, ayant une mission d’assistance à maîtrise d'ouvrage et de Maître d'œuvre d’exécution, pour la construction d’un Data Center, en France. ARGOS est intervenue dès le début du projet, assistant et conseillant le Client dans la rédaction des contrats, basés sur le FIDIC Yellow Book.

Mission

Contract Management

Objectives

  • Drafting of contracts, including one based on the FIDIC Yellow Book;
  • Support in negotiations with contractors;
  • Setting up contractual management tools for an effective project monitoring.

Stakes

  • Oversight of 7 major contracts, of approximately 700 M€;
  • Establishment of contractual monitoring tools.

Results

Negotiations successfully concluded with the contractors, meeting the Owner’s expectations.

Data Center
Contract Management Digital & Technology

Data Center

Construction of a Data Center in Paris region

Mission details

Context

Sur un chantier de data center, accompagnement en gestion contractuelle d’une société d’ingénierie missionnée pour substituer le maître d’œuvre défaillant.

Mission

Contract Management

Objectives

  • Contract management support
  • Substantiated responses to contractors’ claims
  • Assistance in preparing our client’s claim

Stakes

  • Project completion in a challenging context (change of project manager), without delay prejudice to the end Client;
  • Overall works program maintained despite delays caused by the initial Engineer’s default
  • Contractors’ claims amount > € 2,5M

Results

Initial delay recovered – works completed within the contractual Time for Completion
Amicable settlement with the Contractors

DRPJ Paris 17
Contract Management Building & Real Estate

DRPJ Paris 17

Construction de la nouvelle Direction Régionale de la Police Judiciaire à Paris

Mission details

Context

Le projet porte sur la conception, la réalisation et la maintenance (CREM) du nouveau bâtiment de la Direction Régionale de la Police Judiciaire de Paris (DRPJ), situé dans le 17e arrondissement, confié par la Préfecture de Police (Maître d'Ouvrage) à un groupement d’entreprises.
Le marché a été perturbé par de nombreuses modifications du programme, des notifications tardives, des travaux supplémentaires non régularisés et des mises à disposition tardives d'équipements de sûreté.
Malgré ces perturbations, le Groupement a adapté ses moyens et obtenu la réception des travaux avec seulement 2,5 mois de retard.
Argos Construction est intervenu en qualité d'expert au soutien du Groupement dans le cadre de la demande de rémunération complémentaire résultant des modifications dans les conditions d'exécution du contrat.

Mission

Gestion contractuelle

Objectives

  • Analyser et quantifier les perturbations et modifications dans les conditions d'exécution du marché subies par le Groupement
  • Constituer et valoriser le mémoire en demande de rémunération ;
  • Démontrer l'impact des décisions et retards du Maître d'Ouvrage sur les conditions d'exécution et les coûts du Groupement

Stakes

  • Montant global du marché : 112 M€ HT (toutes tranches confondues), dont 100 M € HT pour la Tranche Ferme
  • Durée contractuelle : 44 mois
  • Principaux faits perturbateurs : modification tardive du programme Sûreté, notifications partielles tardives de la Tranche Conditionnelle n°1 (Aménagement), mise à disposition tardive du matériel actif de sûreté, validation tardive des documents d'exécution relatifs à la Signalétique, notification tardive de la couverture téléphonie mobile
Hôpital Sud de la France
Contract Management Building & Real Estate

Hospital — Southern France

Hospital

Mission details

Context

Six months after start-up, the earthworks/utilities contractor was being blamed for delays and held responsible for every site contingency. By bringing the issues back to the facts and clarifying each party's rights and duties, Argos Construction's intervention secured a time extension with no delay penalties.

Mission

Contract management

Objectives

  • Contractual follow-up and traceability of disruptions
  • Management of deadlines and service orders
  • Training of the team in good contractual practice

Stakes

  • 23-month time extension on an initial 25-month schedule
  • €0.8M of additional compensation on a €3M contract

Results

Time extension formalised (delay penalties lifted) and settlement of €0.4M

Tramway Sud de la France
Contract Management Infrastructure & Transport

Tramway — Southern France

Tramway line

Mission details

Context

Brought in on a project already running twelve months late, Argos Construction established a clear view of the situation and prepared the elements of the claim, leading to financial compensation awarded by the court. The case illustrates what proactive contract management and the right tools could have prevented.

Mission

Contractual analysis and claim

Objectives

  • Analysis of contract documents and the technical file
  • Review of pricing and assistance with drafting the claim memorandum
  • Assistance with defending the claim

Stakes

  • 390 days of time extension on an initial 22-month schedule
  • €174,940 on a €1.9M contract
Tramway Sud-Est de la France
Contract Management Infrastructure & Transport

Tramway — South-East France

Tramway line

Mission details

Context

Setting up contract management from the outset made it possible to record every event and send regular reports to the Owner. Amendments and cost overruns were settled immediately, avoiding any dispute.

Mission

Preparatory review and claim memorandum

Objectives

  • Contractual analysis and identification of delay-related issues
  • Establishment of cost-overrun pricing
  • Preparation of the claim for additional compensation

Stakes

  • Schedule of 24 months versus an initial 20 months
  • €4M of additional compensation + €150k waiver of penalties on a €38M (excl. tax) contract
Ferroviaire France
Contract Management Infrastructure & Transport

Rail — France

Railway line

Mission details

Context

Numerous changes introduced by the Owner had given rise to incomplete amendments and erroneous pricing. Argos Construction's critical-path analysis allowed the amendments to be corrected, anticipated subsequent events and produced a new schedule and budget — culminating in a contract extension.

Mission

Claim for additional compensation

Objectives

  • Contractual analysis and reconstruction of disruptive events
  • Delay analysis and review of pricing
  • Drafting of the memorandum and assistance through to acceptance of the works

Stakes

  • Delay of 1 month and 2 weeks on a 4-month-and-2-week schedule
  • €2M on a €9.5M contract
Gare de métro France
Contract Management Infrastructure & Transport

Metro station — France

Metro station

Mission details

Context

Awarded a €180M / 62-month contract for an underground metro station in the Paris region, the joint venture benefited from real-time contract management led by Argos Construction. This approach allowed issues to be addressed regularly with the Owner and a 15-month overall slippage to be managed without delay penalties.

Mission

Assistance to the joint-venture lead with contract management

Objectives

  • Set-up of a contractual and administrative database
  • Operation of management tools and traceability of works
  • Assistance with drafting correspondence and draft amendments

Stakes

  • 15-month time extension on an initial 62-month schedule
  • €20M on a €180M contract

Results

Amendments signed for 11.5 months of time extension and €17M; discussions ongoing

Centre de formation France
Contract Management Building & Real Estate

Training centre — France

Real estate development

Mission details

Context

Engaged to deliver a €74M training centre in 20 months, the project is now running 21 months late with amendments for 17 months already signed. Argos Construction supports the developer in its dealings with a demanding Owner and a joint venture pursuing a tough contractual stance.

Mission

Contract management for the developer

Objectives

  • Set-up of a contractual database
  • Traceability of works and events
  • Assistance with drafting correspondence and amendments

Stakes

  • €74M (excl. tax) construction contract
  • 21-month delay in completion versus a 20-month schedule

Results

Amendments signed for 17 months of time extension and €9.5M; discussions ongoing